PROCESS OF DESIGNING AND CONSTRUCTING BRICK BUILDINGS FOR ENERGY EFFICIENCY MEASURES
Keywords:
ECOVER, designing, brick, energy, economical,, efficient, reconstructionAbstract
In this article shown the process of designing and repairing brick buildings using ceramic facade tiles with an ECOVER 50 mm insulation layer and an air gap of 50 mm. can be cause of increasing energy efficiency, enhancing the artistic and architectural appearance of the building, actively influencing the temperature changes in various sections of the external wall structure.
Downloads
Published
2021-01-13
Issue
Section
Articles
License
Copyright (c) 2020 Sattarov Ikramboy Saparboyevich, Sattarov Temur Ikramboyevich

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
How to Cite
PROCESS OF DESIGNING AND CONSTRUCTING BRICK BUILDINGS FOR ENERGY EFFICIENCY MEASURES . (2021). JournalNX - A Multidisciplinary Peer Reviewed Journal, 164-168. https://repo.journalnx.com/index.php/nx/article/view/400